Category: Piers and abutments
Services: Final detailed design
Period: September 2018 – October 2019
Client: R&P Engineering s.r.l.
Amount: Viaduct over Roundabout 1 – 4.145.582,07 € S04 (IXb )
Viaduct over Roundabout 2 – 2.210.702,40 € S04 (IXb )
Railway overpass – 1.648.114,38 € S04 (IXb )
Final detail design of the retaining walls of the access ramps – 1.765.554,19 € S03 (Ig)
Final detailed design of the sheet piling retaining wall for the railway overpass 502.136,94 € S05 (IXc)