Category: Launchings
Services: Final design during launching
Period: July 2015 – September 2015
Client: Freyssinet International & Cie
Category: Launchings
Services: Final design during launching
Period: July 2015 – September 2015
Client: Freyssinet International & Cie
Launch project for the two continuous girder viaducts in mixed steel-concrete structure Bridge 19 Duck Creek and Bridge B20 Cannons Creek.
Launch project for the two continuous girder viaducts in mixed steel-concrete structure Bridge 19 Duck Creek and Bridge B20 Cannons Creek.
Verification of the decks during the launch phase, pre-dimensioning of the pushing jacks, of the thrust structures on the launching field and of the sliding supports on sledges.
Bridge 19 Duck Creek: lights 75 + 75 m
Bridge 20 Cannons Creek: lights 68 + 86 + 72 m
Verification of the decks during the launch phase, pre-dimensioning of the pushing jacks, of the thrust structures on the launching field and of the sliding supports on sledges.
Bridge 19 Duck Creek: lights 75 + 75 m
Bridge 20 Cannons Creek: lights 68 + 86 + 72 m