Category: Launchings
Services: Final design during launching and erection equipment design
Period: October 2007 / February 2009
Client: Seteco Ingegneria s.r.l. B.T.P. Costruzioni Generali s.p.a.
Category: Launchings
Services: Final design during launching and erection equipment design
Period: October 2007 / February 2009
Client: Seteco Ingegneria s.r.l. B.T.P. Costruzioni Generali s.p.a.
Assembly and launching of the viaducts Navale N/S, Bollone N / S and Fiumicello Nord in mixed steel-concrete structure.
Assembly and launching of the viaducts Navale N/S, Bollone N / S and Fiumicello Nord in mixed steel-concrete structure.
Final design of the launching nose, of the thrust structures on the assembling yard and of the lowering equipment . Assistance to the construction site during the launching and lowering phases. Min geometrical features of the viaducts:
• North / South Naval: span 93 + 110 + 93 m
• Bollone Nord: span 80 + 4×95 + 65 m
• Fiumicello Nord: span 70 + 70 + 5×90 + 55 + 55 m
Final design of the launching nose, of the thrust structures on the assembling yard and of the lowering equipment . Assistance to the construction site during the launching and lowering phases. Min geometrical features of the viaducts:
• North / South Naval: span 93 + 110 + 93 m
• Bollone Nord: span 80 + 4×95 + 65 m
• Fiumicello Nord: span 70 + 70 + 5×90 + 55 + 55 m