
Paris Express, line 17, lot 2
First sections of the viaduct completed: Line 17 of the Grand Paris Express has reached an important milestone with the installation of the first sections of metal viaducts.
Steel Project Engineering is specifically taking care of the Executive Design of the Station and the Pedestrian Footbridge over the railway bed, in addition to the Assembly Project of the railway viaducts. The viaduct, which is just under 3 km long, includes crossings over the A1/A3 motorways, the RD40 and the RER.
For further details, please refer to a recent post published by NGE-BPT, which includes an interesting video showing aerial images of the Grand Paris Express: https://www.linkedin.com/posts/nge-btp_ligne17-grandparisexpress-ugcPost-7295350990688378880-w4h4?utm_source=share&utm_medium=member_android