Motorway overpass on the highway A22 Modena-Brennero

Design of steel decks, piers and abutments for the Rovereto Sud interchange.

Category: Road Bridges
Activity: Final detailed and construction design
Period: January 2003 – December 2003
Client: Seteco Ingegneria s.r.l. – Cariboni s.p.a. – Cordioli s.p.a.
Value: €2.521.089,50 (Category IX b) – €301.487,18 (Category I g)

Final detailed design of continuous girder viaduct in composite steel structure 140 m long (2 ways, spans length 40 m + 60 m + 40 m, constant radius of 130m).

Final detailed design of the piers and abutments in reinforced concrete. Design of the surface foundations of piers and abutments.

Final detailed design of continuous girder viaduct in composite steel structure 140 m long (2 ways, spans length 40 m + 60 m + 40 m, constant radius of 130m).

Final detailed design of the piers and abutments in reinforced concrete. Design of the surface foundations of piers and abutments.

The viaducts transversal section is 10.80m-wide with a 9m-wide carriageway and two 1.80m-wide curbs. The piers are circular in section and the foundations are shallow.

The viaducts transversal section is 10.80m-wide with a 9m-wide carriageway and two 1.80m-wide curbs. The piers are circular in section and the foundations are shallow.

SS 117 Viaducts of the route “Centrale Sicula”

Design of steel decks and steel pier caps of the Rogillo I and II, Montagna and Salice viaducts.

Category: Road bridges
Services: Detailed design
Period: December 2017 – August 2018
Client: LMV S.p.a. ANAS S.p.a.
Total weight: about 3500 tons
Amount: €7.744.681,90 (S.04 [formerly IXB])

Road viaducts in a composite steel-concrete structure realized with continuous beam of 3 spans (40 + 60 + 40 m , total length of 140m) for the Rogillo I viaduct, 5 spans (45.50 + 3×56.00 + 41 , 50 , total length of 255m) for the Rogillo II viaduct, 6 spans (25 + 45 + 2×66 + 64 + 41, total length of 307m) for the Montagna viaduct, 6 spans (36.5 + 4×61 + 49.5, total length of 330m) for the Salice viaduct.

Road viaducts in a composite steel-concrete structure realized with continuous beam of 3 spans (40 + 60 + 40 m , total length of 140m) for the Rogillo I viaduct, 5 spans (45.50 + 3×56.00 + 41 , 50 , total length of 255m) for the Rogillo II viaduct, 6 spans (25 + 45 + 2×66 + 64 + 41, total length of 307m) for the Montagna viaduct, 6 spans (36.5 + 4×61 + 49.5, total length of 330m) for the Salice viaduct.

The cross section of the deck has an overall width of 12.75 m with a carriageway width of 11.25 m. The cross section has two main beams with a central secondary beam. The slab, that is 22 cm thick, is cast on steel predalles. The joints are bolted.
The decks rest on the piers by means of steel pulvins and are seismically insulated by double curved surface devices and shear key; the seismic behaviour has been analysed in a non-linear field.

The cross section of the deck has an overall width of 12.75 m with a carriageway width of 11.25 m. The cross section has two main beams with a central secondary beam. The slab, that is 22 cm thick, is cast on steel predalles. The joints are bolted.
The decks rest on the piers by means of steel pulvins and are seismically insulated by double curved surface devices and shear key; the seismic behaviour has been analysed in a non-linear field.

Viaducts for the “Caselle Open Mall”

Railway overpass and road overpasses of the shopping mall.

Category: Road bridges
Services: Preliminary and detailed design
Period: September 2017 – October 2019
Customer: R&P Engineering s.r.l.
Amount: Viaduct on “Rotatoria 1” 4.145.582,07 € S04 (IXb) – Viaduct on “Rotatoria 2” 2.210.702,40 € S04 (IXb) – Railway overpass 1.648.114,38 € S04 (IXb)

The Viaduct on “Rotatoria 1” has a deck with a constant width of 19.8 [m], and it is composed by two carriageways of 8.25 [m] realized with 4 composite I-beams (1.6 [m] height) in a composite steel-concrete system with static layout of a continuous beam with 9 spans, span equal to 27.5 [m], for a total length of approximately 247.5 [m].

The Viaduct on “Rotatoria 1” has a deck with a constant width of 19.8 [m], and it is composed by two carriageways of 8.25 [m] realized with 4 composite I-beams (1.6 [m] height) in a composite steel-concrete system with static layout of a continuous beam with 9 spans, span equal to 27.5 [m], for a total length of approximately 247.5 [m].

The Viaduct on “Rotatoria 2” consists of an upper deck with an 11.1 [m] platform and a 9.60 [m] roadway supported by 3 beams of 2 [m] height in composite steel-concrete I-section with a static layout of a continuous beam with 6 spans, spans equal to 28 [m] in the two side spans and 40 [m] in the four central spans, for a total length of approximately 216 [m].

The Viaduct on “Rotatoria 2” consists of an upper deck with an 11.1 [m] platform and a 9.60 [m] roadway supported by 3 beams of 2 [m] height in composite steel-concrete I-section with a static layout of a continuous beam with 6 spans, spans equal to 28 [m] in the two side spans and 40 [m] in the four central spans, for a total length of approximately 216 [m].

The railway overpass has a deck with an 11.5 m roadway made up of 9 juxtaposed beams 1.25 [m] high in a composite steel-concrete section with an isostatic arrangement over a span equal to 43 [m].

The railway overpass has a deck with an 11.5 m roadway made up of 9 juxtaposed beams 1.25 [m] high in a composite steel-concrete section with an isostatic arrangement over a span equal to 43 [m].

Overpass on the A22 Modena-Brennero motorway

Executive design and assembly of the steel bridge.

Category: Road bridges
Services: Detailed design
Period: October 2019 – December 2020
Client: Bit spa
Amount:1.255.445,07 € S04 (IXb)

The overpass on the A22 motorway at Egna is composed by a single span of 46 m with a bowstring arch with eliminated thrust supporting a 6.5m-wide carriageway, pedestrian walkway and cycle path.
It consists of a straight steel deck with an orthotropic plate, supported by a single arch, also in steel, inclined at 20° from the vertical and located laterally, in an eccentric position with respect to the longitudinal axis. The arch has an irregular pentagonal box and a jib of 7.5 m from the deck. The arch-bridge connection is made by means of welded double T-shaped hangers with variable section.
The deck consists of a multi-cellular caisson with 4 cores with a maximum height of 1.4 m with 3.3m pitch diaphragms. The cycle path and the pedestrian walkway, with a usable width of 2.8 m and 2.5 m, are supported by double T brackets with variable height, according to the pitch of the diaphragms.

The overpass on the A22 motorway at Egna is composed by a single span of 46 m with a bowstring arch with eliminated thrust supporting a 6.5m-wide carriageway, pedestrian walkway and cycle path.
It consists of a straight steel deck with an orthotropic plate, supported by a single arch, also in steel, inclined at 20° from the vertical and located laterally, in an eccentric position with respect to the longitudinal axis. The arch has an irregular pentagonal box and a jib of 7.5 m from the deck. The arch-bridge connection is made by means of welded double T-shaped hangers with variable section.
The deck consists of a multi-cellular caisson with 4 cores with a maximum height of 1.4 m with 3.3m pitch diaphragms. The cycle path and the pedestrian walkway, with a usable width of 2.8 m and 2.5 m, are supported by double T brackets with variable height, according to the pitch of the diaphragms.

Bridge over the Adige river in Egna

Executive design and assembly of steel bridges.

Category: Road bridges
Services: Detailed design
Period: May 2019 – December 2020
Client: Bit s.p.a.
Amount: 3.082.329,96 € S04 (IXb)

The bridge over the River Adige is composed by a single span of 81.4m with a bowstring arch supporting a 6.5m-wide carriageway, a pedestrian walkway and a cycle path.
It consists of a straight steel deck with an orthotropic plate, supported by a single steel archinclined at 20° from the vertical and located laterally, in an eccentric position with respect to the longitudinal axis. The arch has an irregular pentagonal box and a jib of 13.5 m from the deck. The arch-bridge connection is made by means of welded I-shaped hangers with variable section.

The bridge over the River Adige is composed by a single span of 81.4m with a bowstring arch supporting a 6.5m-wide carriageway, a pedestrian walkway and a cycle path.
It consists of a straight steel deck with an orthotropic plate, supported by a single steel archinclined at 20° from the vertical and located laterally, in an eccentric position with respect to the longitudinal axis. The arch has an irregular pentagonal box and a jib of 13.5 m from the deck. The arch-bridge connection is made by means of welded I-shaped hangers with variable section.

The deck consists of a multi-cellular box with 5 webs and a maximum height of 1.6m with diaphragms spaced by 3.3m. The cycle path and the pedestrian walkway, with an effective width of 2.8m and 2.5m, are supported by I-section cantilevers with variable height and placed in correspondence of the diaphragms. The pedestrian path progressively distances itself from the roadway proceeding towards the centre line.

The deck consists of a multi-cellular box with 5 webs and a maximum height of 1.6m with diaphragms spaced by 3.3m. The cycle path and the pedestrian walkway, with an effective width of 2.8m and 2.5m, are supported by I-section cantilevers with variable height and placed in correspondence of the diaphragms. The pedestrian path progressively distances itself from the roadway proceeding towards the centre line.