Category: Special Equipment
Activity: Final and Construction design
Period: April 2009 – September 2009
Client: SPIC s.r.l.
Value: €960,000.00 (Category IX b)
Category: Special Equipment
Activity: Final and Construction design
Period: April 2009 – September 2009
Client: SPIC s.r.l.
Value: €960,000.00 (Category IX b)
Metal structures for the prefabrication of prestressed concrete segments erected by cantilever system.
Metal structures for the prefabrication of prestressed concrete segments erected by cantilever system.
Studies of the metal structures of the prefabrication tools (fixed part and mobile part) and of the trolleys for moving the segments. Studies of metal formwork.
Studies of the metal structures of the prefabrication tools (fixed part and mobile part) and of the trolleys for moving the segments. Studies of metal formwork.