Category: Road Bridges
Activity: Final detailed and construction design
Period:April 2004 – December 2005
Client:Seteco Engineering srl . – Collini construction spa – MAEG spa.
Value: €14.032.800,00 (Category IX b)
Category: Road Bridges
Activity: Final detailed and construction design
Period:April 2004 – December 2005
Client:Seteco Engineering srl . – Collini construction spa – MAEG spa.
Value: €14.032.800,00 (Category IX b)
Road viaducts near Noghere highway interchange with continuous beam scheme and composite steel-concrete transversal section.
Road viaducts near Noghere highway interchange with continuous beam scheme and composite steel-concrete transversal section.
The deck width varies between 8 m (in correspondence with the interchange) and 19.80 m (for the widest viaducts).
The deck width varies between 8 m (in correspondence with the interchange) and 19.80 m (for the widest viaducts).
Design of the circular piles in reinforced concrete cast in situ. The designed viaducts are the following:
Design of the circular piles in reinforced concrete cast in situ. The designed viaducts are the following: