Category: Footbridges
Services: Detailed design
Period: April 2018 – September 2018
Client: Cimolai s.p.a.
Category: Footbridges
Services: Detailed design
Period: April 2018 – September 2018
Client: Cimolai s.p.a.
The works are part of the project to build a five kilometer (5k) elevated walkway around London’s Greenwich Peninsula. The elevated path is made up of several “islands” (1, 1A, 2, 3, 4, 5 and 5A), connected to each other by pedestrian walkways.
The works are part of the project to build a five kilometer (5k) elevated walkway around London’s Greenwich Peninsula. The elevated path is made up of several “islands” (1, 1A, 2, 3, 4, 5 and 5A), connected to each other by pedestrian walkways.
Most of the structures are steel and painted structures. They present an aesthetic with extremely innovative forms and their design required a particular study with regard to the fittings, which are not in view.
The core, the foundation slabs and the pier caps are made of reinforced concrete (RC).
Most of the structures are steel and painted structures. They present an aesthetic with extremely innovative forms and their design required a particular study with regard to the fittings, which are not in view.
The core, the foundation slabs and the pier caps are made of reinforced concrete (RC).