Category: Industrial Buildings
Services: Final detailed design
Period: November 2018 – January 2019
Client: Cimolai S.p.a.
Category: Industrial Buildings
Services: Final detailed design
Period: November 2018 – January 2019
Client: Cimolai S.p.a.
Design of the connections of a spatial steel structure with mixed truss-frame behavior.
Validation of the final design and optimization of the connections considering the six internal actions by means of 3D analysis.
Design of the connections of a spatial steel structure with mixed truss-frame behavior.
Validation of the final design and optimization of the connections considering the six internal actions by means of 3D analysis.