Category: Erections
Services: Erection Design
Period: February 2021 – February 2022
Client: Fincantieri Infrastructure S.p.A.
Category: Erections
Services: Erection Design
Period: February 2021 – February 2022
Client: Fincantieri Infrastructure S.p.A.
The safe confinement steel structure for the OMO (raw materials) park located inside the “Acciaierie d’Italia” factory in Taranto has plan dimensions of 110 x 385m and is made up of 63 trussed arches, spaced by 6.20 m and with a maximum height of approximately 42m.
Because of the erection phases, the structure was divided into 9 macro-modules, each consisting of 7 arches. Once the central segments of each macro-module are assembled, they are raised by means of 4 strand jacks connected to a horizontal truss beam which can slide between vertical guides placed on the lifting towers.
The safe confinement steel structure for the OMO (raw materials) park located inside the “Acciaierie d’Italia” factory in Taranto has plan dimensions of 110 x 385m and is made up of 63 trussed arches, spaced by 6.20 m and with a maximum height of approximately 42m.
Because of the erection phases, the structure was divided into 9 macro-modules, each consisting of 7 arches. Once the central segments of each macro-module are assembled, they are raised by means of 4 strand jacks connected to a horizontal truss beam which can slide between vertical guides placed on the lifting towers.
Once the assembly of a single macro-module was completed, it was placed on trolleys and then pushed towards its final position by means of a couple of strand jacks.
Once the assembly of a single macro-module was completed, it was placed on trolleys and then pushed towards its final position by means of a couple of strand jacks.