Construction of a new cycle-pedestrian bridge over the river Egola in the village of Ponte a Egola.
Construction of a new cycle-pedestrian bridge over the river Egola in the village of Ponte a Egola.
Design of beam-through-bridge and the cycle-pedestrian path connected to the existing road aimed in particular at creating a connection with the town of Molino d’Egola. The static scheme is that of a simply-supported beam with a 37.70 m.
Design of beam-through-bridge and the cycle-pedestrian path connected to the existing road aimed in particular at creating a connection with the town of Molino d’Egola. The static scheme is that of a simply-supported beam with a 37.70 m.