Category: Revamping of existing structures
Services: Specialist counseling
Period: May 2018 – June 2018
Customer: Freyssinet
Category: Revamping of existing structures
Services: Specialist counseling
Period: May 2018 – June 2018
Customer: Freyssinet
The job was part of the study of the reinforcement of the existing preheating tower and the definition of reinforcing solutions, in order to adapt to a series of new loads expected on the structure. The object of this work is the reinforcement of the beam named 4F_04, located on the 4th floor.
The job was part of the study of the reinforcement of the existing preheating tower and the definition of reinforcing solutions, in order to adapt to a series of new loads expected on the structure. The object of this work is the reinforcement of the beam named 4F_04, located on the 4th floor.
The current section of the 4F_04 beam is a symmetrical I-section with a height of 2520 mm, a bottom and top flange of 400×45 and a web thickness of 20 mm, in S235 steel.
This section is enhanced by:
– a T welded to the lower flange of dimensions: h = 500mm, flange 400×50, web 20mm
– longitudinal rectangular-shaped stiffeners 250×20 at a distance of 700mm and 1400mm from the upper face of the beam.
The current section of the 4F_04 beam is a symmetrical I-section with a height of 2520 mm, a bottom and top flange of 400×45 and a web thickness of 20 mm, in S235 steel.
This section is enhanced by:
– a T welded to the lower flange of dimensions: h = 500mm, flange 400×50, web 20mm
– longitudinal rectangular-shaped stiffeners 250×20 at a distance of 700mm and 1400mm from the upper face of the beam.