Rogliano bridge tender – Final award

With the final award determination, the provisional ranking of the tender “EXECUTIVE DESIGN, CSP, GEOLOGICAL STUDY AND INVESTIGATION PLAN FOR THE CONSTRUCTION OF THE BRIDGE IN THE CUTURA LOCATION OF THE MUNICIPALITY OF ROGLIANO – 2022 DESIGN FUND” was confirmed. Steel Project Engineering is the agent of the newly formed R.T.I. composed together with the principals IDRA INGEGNERIA STP S.R.L. – PASIAN ENGINEERING S.R.L. (principal) – Dr. SERGIO SOLERI (principal) and Eng. CLAUDIA ALLEVATO (principal), which was awarded the Executive Design of the work.

Good work to the entire group!